Jump to content

Mallow–Tralee railway line

From Wikipedia, the free encyclopedia
(Redirected from Mallow–Tralee line)

Mallow–Tralee
Service from Cork after reversing out of Killarney station to continue forwards to Tralee
Overview
StatusOperational
LocaleCounty Cork, County Kerry
Termini
Stations7
Service
TypeHeavy rail, Inter-city rail
SystemIarnród Éireann
ServicesMallow–Tralee
Dublin–Tralee
Cork–Tralee
OperatorIarnród Éireann
Rolling stock22000 Class
History
Opened15 July 1853 (1853-07-15)
Technical
Line length61.5 mi (99.0 km)
Number of tracksSingle track
Track gauge1,600 mm (5 ft 3 in) Irish gauge
Operating speed70 mph (110 km/h)
Mallow-Tralee

Mallow
Lombardstown
Banteer
Rathcool
Millstreet
Rathmore
Headford Junction
Killarney
Ballybrack
Farranfore
for Kerry Airport Kerry Airport
Gortatlea
Tralee Casement

The Mallow–Tralee line runs from Mallow to Tralee Casement. Intermediate stations include Banteer, Millstreet, Rathmore, Killarney and Farranfore.

A peculiar arrangement at Killarney is in place, in which trains from Mallow enter Killarney, which is a dead-end. Trains continuing to Tralee then have to reverse until they reach the junction, before changing direction again to continue westwards.[1]

Irish Rail's network statement gives the length of the line as 61.5 miles (99.0 km),[2] though other sources give the length of the line as 62+1⁄4 miles instead.[3] The line from Mallow to Killarney was noted for severe gradients compared to the line from Dublin to Mallow though the Killarney expresses of 1899 were timed to achieve the section at 40.75 miles per hour (65.58 km/h) westbound and 38.2 miles per hour (61.5 km/h) eastbound.[3]

History

[edit]
Killarney Junction Railway Act 1846
Act of Parliament
coat of arms
Long titleAn Act for making a Railway from the Town of Mallow to the Town of Killarney, to be called "The Killarney Junction Railway."
Citation9 & 10 Vict. c. cc
Dates
Royal assent16 July 1846
Other legislation
Amended by
  • Killarney Junction Railway Act 1851
Killarney Junction Railway Act 1851
Act of Parliament
coat of arms
Long titleAn Act to amend "The Killarney Junction Railway Act, 1846."
Citation14 & 15 Vict. c. ciii
Dates
Royal assent24 July 1851
Other legislation
Amends
  • Killarney Junction Railway Act 1846
Text of statute as originally enacted

The Killarney Junction Railway (KJR) was authorised by the Killarney Junction Railway Act 1846 (9 & 10 Vict. c. cc) and completed the construction of the line from Mallow to the holiday resort of Killarney in 1853.

Tralee and Killarney Railway Act 1853
Act of Parliament
coat of arms
Citation16 & 17 Vict. c. clxxxix
Tralee and Killarney Railway Act 1854
Act of Parliament
coat of arms
Long titleAn Act to alter the borrowing Powers of the Tralee and Killarney Railway Company.
Citation20 & 21 Vict. c. xvii
Dates
Royal assent26 June 1857
Text of statute as originally enacted
Tralee and Killarney Railway Act 1859
Act of Parliament
coat of arms
Long titleAn Act for reviving the Powers and extending the Time for the Completion of the Railway and Works authorized by "The Tralee and Killarney Railway Act, 1853."
Citation22 Vict. c. x
Dates
Royal assent19 April 1859

The Tralee and Killarney Railway was authorised by the Tralee and Killarney Railway Act 1853 (16 & 17 Vict. c. clxxxix) and opened the extension from Killarney junction to Tralee in 1859.[4]

The Great Southern and Western Railway (GS&WR) who had invested in both companies absorbed them both in 1860.[1]

At Tralee there were small sidings that were convenient to those of the narrow gauge Tralee and Dingle Light Railway. There was also links beyond the road to the marshalling yards, the branch to Fenit, and the Limerick–Tralee line.[5]

Rolling stock

[edit]

Alexander McDonnell GS&WR Class 2 Kerry bogies were specifically intended for passenger services on the line.[6] There was a trial of a Drumm Battery Train with temporary charging points set up on the line during the late 1930s or 1940s.[7] 22000 Class ICR railcars first began passenger services on the line in September 2008.[8]

Branches

[edit]
A non-geographical diagram of the Mallow - Tralee line.

Castleisland

[edit]

The 4 miles (6.4 km) long Castleisland branch connected to the main line at Gortalea at a junction facing Tralee. It closed in 1974.[9] Alexander McDonnell designed a combined engine and carriage, the GS&WR Class 90, to work the branch.[6]

Kenmare

[edit]

The branch to Kenmare was about 20 miles (32 km) long and was opened on 4 September 1893.[1] It closed on 1 February 1960.[4][10][11]

Newmarket

[edit]

There was a 8+3⁄4 miles (14.1 km) branch to Newmarket from Banteer with an intermediate station at Kanturk.[12] The line opened on 1 April 1889 which closed to passengers on 27 January 1947 and completely on 1 January 1963,[1] though other sources say 4 February 1963.[4]

Valentia

[edit]

The terminus on the branch to Valentia Harbour was further west than any in Europe.[9]

[edit]

The railway passes close by to Kerry Airport, with the station at Farranfore being located about 1 mile (1.6 km) away.[13][14]

References

[edit]
  1. 1 2 3 4 Murray, K. A.; McNeil, D.B. (1976). The Great Southern & Western Railway. Irish Record Railway Society. pp. 26–29, 58–59, 186–188, 195. ISBN 0904078051.
  2. ↑ Reidy, Michael (30 October 2021). Network Statement (PDF) (2022 ed.). Irish Rail. pp. 75–. Retrieved 21 September 2022.
  3. 1 2 Ahrons, E. L. (1954). L. L. Asher (ed.). Locomotive and train working in the latter part of the nineteenth century. Vol. six. W Heffer & Sons Ltd. pp. 21, 25–26.
  4. 1 2 3 "Kanturk station" (PDF). Railscot – Irish Railways. Retrieved 16 October 2007.
  5. ↑ "Tralee & Dingle Light Railway — Maps". Chester Model Railways Club. Archived from the original on 28 June 2016. Retrieved 18 July 2018.
  6. 1 2 Bulleid, H.A.V. (1967). The Aspinall Era. Ian Allan, London. pp. 38–39, 73.
  7. ↑ Baker, Michael H.C. (1972). Irish Railways Since 1916. Shepperton: Ian Allan. pp. 101–102. ISBN 0-7110-0282-7.
  8. ↑ "Journal 168 Operations". Irish Railway Record Society. 23 (168). February 2009. Archived from the original on 4 December 2017. Retrieved 19 July 2019.
  9. 1 2 Baker, H. C. (1995). Ireland's Railways Past and Present - Ireland - An Introduction (2005 ed.). Past and Present Publishing Ltd. p. 68,69. ISBN 1858952468.
  10. ↑ "Kenmare's Last Train – Amharc Éireann: Eagrán 32". Irish Film Institute. 18 July 2016. On the 1st of February 1960, Kenmare locals and railway workers looked on as the last train made its final journey on the tracks before the line closed
  11. ↑ "36 hours in Kenmare". irishtimes.com. Irish Times. 6 August 2023. Retrieved 8 March 2023. the last train out of Kenmare [was] on February 1st, 1960, at 9.30am. The railway had opened in 1893, and the Kenmare branch line was the last stop on the Great Southern and Western Railway route
  12. ↑ "Newmarket Railway". áth trasna. Archived from the original on 16 October 2018. Retrieved 18 July 2019.
  13. ↑ "Kerry Airport". Discover Kerry. Travel Ireland. Retrieved 10 May 2021.
  14. ↑ "Farranfore". irishrail.ie. Irish Rail. Retrieved 22 September 2022.