Jump to content

Yeongdong Line

From Wikipedia, the free encyclopedia
(Redirected from Yangwon station (Bonghwa))
Yeongdong Line
Overview
Native name영동선(嶺東線)
StatusOperational
OwnerKorea Rail Network Authority
LocaleNorth Gyeongsang
Gangwon (South Korea)
Termini
Stations37
Service
TypeHeavy rail, Passenger/Freight
Regional rail
OperatorKorail
History
OpenedStages between 1940-1962
Closed1 March 1979
(Gangneung – Gyeongpodae)
Technical
Line length192.7 km (119.7 mi)
Num of tracksSingle track
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification25 kV/60 Hz AC Overhead line
Route map

0.0
Yeongju
9.0
Mundan Signal box
14.7
Bonghwa
20.2
Geochon
Bongseong Tunnel
25.7
Bongseong
Pungjeong Tunnel
32.7
Beopjeon
Beopjeon Tunnel
37.9
Chunyang
42.7
Nokdong
47.6
Imgi
Gwan-am Tunnel
52.7
Hyeondong
Pungae Tunnel
59.3
Buncheon
63.6
Bidong
65.5
Yangwon
69.2
Seungbu
76.8
Seokpo
83.0
Dongjeom
87.0
Cheoram
91.3
Baeksan
92.6
Dongbaeksan
closed 2012
93.1
Dongbaeksan
95.7
Tongri
Incline
closed 1963
103.4
Simpori
closed 2012
103.1
Soran Signal box (in Tunnel)
107.4
Nahanjeong
closed 2012
closed 2012
108.9
Heungjeon
closed 2012
111.3
Dogye
Osip stream
116.0
Gosa-ri
117.7
Hagosa-ri
121.2
Macha-ri
126.6
Singi
131.8
Sangjeong Signal box
Miro Tunnel
136.5
Miro
140.1
Dogyeong-ri Signal Box
Jisang Tunnel ↑Samcheok/Donghae↓
←Samcheok Line (to Sancheok)
Bukpyeong Line (to Samhwa)→
147.6
Donghae
Pyeongneung Signal Box
closed 1969
←Mukho Port Line
Mukho Port
153.6
Mukho
159.6
Mangsang
160.3
Mangsang Beach
165.1
Okgye
Jeongdongjin crossing
176.5
Jeongdongjin
183.6
Anin
186.3
Sidong
closed 1974
188.9
cheonglyang Signal box[1]
Gangneung South Stream
192.7
Gangneung
198.2
Gyeongpodae
closed 1979
Yeongdong Line
Hangul
영동선
Hanja
嶺東線
RRYeongdongseon
MRYŏngdongsŏn

The Yeongdong Line is a line of Korail. It connects Yeongju in North Gyeongsang Province with Gangneung in Gangwon Province. From Yeongju, it crosses the Taebaek Mountains and reaches the Sea of Japan (East Sea) at Donghae, thence proceeding north to Gangneung.

At Yeongju, the line connects with the Gyeongbuk and Jungang Lines. Some trains travel directly from one to the other, so that it is possible to travel directly from Seoul or Busan to Gangneung by rail.

History

[edit]

Construction

[edit]

The first 41.4 km (25.7 mi) section of the line (Mukho Port–Dogye) was opened by the privately owned Samcheok Railway on 31 July 1940.[2] The line was named Cheoram Line, which ran from Mukho, a port on Korea's east coast that became part of Donghae in 1980, to Cheoram in the Taebaek Mountains, to develop three coal fields.[3] Between Simpo-ri and Tong-ri stations, the great height difference was scaled by a steep double-track railway.[4] Freight railcars going up and down were connected to the same cable, passengers had to walk up the mountain.[4] A 12.9 km (8.0 mi) branch from Bukpyeong station (today Donghae station) to Samcheok, the Samcheok Line, was opened on 11 February 11.[5]

Another section of the future Yeongdong Line was first projected as a branch line from Yeongju to Chunyang for the exploitation of the forest areas and mines in the area, the Yeongchun Line.[6] Permission to build the line was given to the privately owned Chosen Railway on 16 October 1944,[7] and work began that year with local forced labourers.[6] Although the first section from Yeongju to Naeseong (today Bonghwa) was almost complete by August 1945, that month World War II ended, a Korean provisional government formed, and a flood damaged the tracks, leading to the abandonment of the line.[6] After the nationalisation of the line work resumed in 1949, when the Economic Cooperation Administration, the United States government agency administering the Marshall Plan, also launched a plan to revive South Korea's economy, which included the construction of new railway lines.[6] One new line under the plan was the 86.4 km (53.7 mi) long Yeongam Line from Yeongju to Cheoram, which included and extended the Yeongchun Line alignment planned by the Chosen Railway to link up the Cheoram Line with the rest of the network.[6] The reconstructed 14.1 km (8.8 mi) from Yeongju to Naeseong opened in March 1950.[6] Construction was interrupted again because of the Korean War in 1950. After the end of the war work was resumed in 1953, and the last section finally opened in 1955.[6][3] The scenic Yeongam Line included 55 bridges and 33 tunnels:[8]

DateSectionLength
1 February 1950Yeongju – Naeseong (Bonghwa)14.1 km
1 February 1955Naeseong – Bongseong12.0 km
1 July 1955Bongseong – Chunyang12.2 km
31 December 1955Chunyang – Cheoram49.2 km

Following the 1961 coup, the Supreme Council for National Reconstruction started South Korea's first five-year plan, which included a construction program to complete the railway network, to foster economic growth.[4] The Gangwon Bukbu Line,[8] a railway along the eastern coast from Mukho to Gyeongpo-dong in Gangneung, the endpoint of a narrow-gauge railway to Sokcho, was opened until 1962 as follows:[3]

DateSectionLength
5 May 1961Bukpyeong (Donghae) – Okkye18.2 km
6 November 1962Okkye – Gyeongpodae33.1 km

This line was also called the Donghae Bukbu Line[3] with view to a planned connection with the existing line by the same name further north. On May 17, 1963, the Yeongam, Cheoram and Gangwon Bukbu Lines were integrated into a single line from Yeongju to Gangneung under the present name as the Yeongdong Line.[3] Meanwhile, from August 1961, the 8.5 km (5.3 mi) Hwangji switchback section was built to bypass the cable-hauled section between Simpo-ri and Tong-ri stations, which opened on May 30, 1963.[4]

A number of branches were built from the line, among them the 9.0 km (5.6 mi) long Hwangji Branchline from Baeksan to Hwangji (today Taebaek), which opened on December 20, 1962,[4] and was integrated into the Taebaek Line in 1973.

After the closure of the Gangneung–Gyeongpo-dong section on March 1, 1979, the total length of the line reduced from 200 km (124.3 mi) to 193.6 km (120.3 mi).[3]

Upgrade

[edit]

Electrification reached the line from the Taebaek Line, when the catenary on the 85.5 km long section from Gohan on the Taebaek Line via junction station Baeksan to Donghae went into service on December 5, 1975. On March 28, 1997, the 87.0 km long section from the junction to Yeongju followed, and electrification was completed with the 45.1 km long Donghae–Gangneung section on September 8, 2005.[9]

The steep descent from Dongbaeksan to Dogye contains switchbacks, which hinder smooth traffic. In addition, a 1996 investigation found that the section is endangered by soil subsistence and the ageing of tunnels.[10] To solve these problems, Korail built a 19.6 km (12.2 mi) new alignment between the two stations with a budget of 510.322 billion won.[11] The main part of the section is the 16,240 m (53,281 ft) Solan Tunnel, which includes a spiral.[12][13] The tunnel was opened on 27 June 2012.