The FCC’s foreign-router ban restricts authorization of new foreign-produced consumer router models; it does not require households to stop using routers they already lawfully bought. The agency’s router restriction guidance also permits continued import and sale of previously authorized models. New covered models need a conditional approval from the Department of War or Department of Homeland Security before they can receive FCC equipment authorization.
That distinction changes the practical response. A household with supported equipment does not need to replace it solely because of the restriction. A retailer or ISP buying a new model needs to establish its authorization status and any applicable approval. Our assessment is that model-level eligibility and continuing security support are the useful purchasing criteria; a brand’s headquarters alone answers neither question.
Don't miss new tech stories on Google
Add Tech Insider once in the Google app and our stories appear in your news suggestions.
Existing authorization and a new model follow different rules
The FCC Covered List records the router addition on March 23, 2026. It followed a White House-convened interagency national-security determination. The FCC says that assessment cited supply-chain vulnerabilities and risks to the economy, critical infrastructure, national defense and US persons. The resulting category covers foreign-produced routers except those granted the specified conditional approval.
For new covered models, the restriction prevents FCC equipment authorization and therefore prevents their import or sale in the United States. Existing authorized models remain a separate category. The FCC points to the FCC ID on a device as the identifier for that authorization; its guidance allows those models to continue being imported, sold and used.
This is more than permission to sell a warehouse’s remaining stock. The FCC explicitly includes continued import of previously authorized models. Consumers can also keep using already-purchased routers. When replacing equipment, identify the exact model and authorization rather than assuming every router under the same brand has identical status. Our ASUS and TP-Link router comparison addresses hardware differences; use the FCC record separately to establish US eligibility.
Production and product functions determine coverage
The FCC’s definition of foreign production reaches major stages including manufacturing, assembly, design and development. Its guidance treats both a US-designed router manufactured abroad and a foreign-designed router manufactured in the United States as covered. The producer’s nationality does not change that analysis.
Components receive different treatment. A device does not become covered solely because it contains a covered component, except for a covered modular transmitter under the FCC’s rules. The FAQ consequently says a US-produced router is not covered simply because it contains foreign-made components. For a manufacturer, documenting the device’s production stages is therefore more useful than relying on either a headquarters address or a single component’s origin.
The FCC product-scope table includes several residential networking products beyond a standalone home router. Combined modem/router gateways remain inside the scope, including ISP-provided models. An optical network terminal without the router function is a different category from a residential gateway that incorporates routing.
| Device category in FCC guidance | Treatment under the router definition |
|---|---|
| Consumer and small-business retail routers that end users can install | Included |
| Portable or mobile MiFi Wi-Fi and hotspot devices for residential use | Included |
| LTE/5G customer-premises equipment for residential use | Included |
| Residential routers installed by a professional or ISP | Included |
| Residential gateways combining modem and router functions | Included |
| Analog telephone adapters with Ethernet LAN/WAN ports | Excluded |
| Femtocells and optical network terminals | Excluded |
| Industrial, enterprise or military equipment | Excluded |
| Mobile phones with hotspot features | Excluded |
Covered devices cannot obtain authorization through the streamlined Supplier’s Declaration of Conformity route either. However, the router category does not by itself make every producing company an entity identified on the Covered List. The restriction on the router and the treatment of the producer’s other equipment are separate questions.
Conditional approvals now cover named models and product classes
The published conditional-approval register lists both individual models and broader product classes. The following entries show the variety of approval scopes and their authorization windows. They replace a brand-wide assumption with the specific products the FCC names.
| Producer | Products identified in the entry | Approval window |
|---|---|---|
| Netgear | Listed Nighthawk and Orbi router series, CAX cable gateways and CM cable modems | April 14, 2026 to October 1, 2027 |
| Adtran | Service Delivery Gateway class routers | April 14, 2026 to October 1, 2027 |
| eero | eero, Pro, Max, PoE, Outdoor, Signal and Amazon Leo routers | April 22, 2026 to October 31, 2027 |
| Vantiva | CWA438TX router | July 8, 2026 to January 3, 2028 |
| SpaceX Services | Starlink routers | July 27, 2026 to February 1, 2028 |
| ASUS | Listed RT, ROG GT, ROG Strix GS, TUF Gaming, ExpertWiFi, ZenWiFi Mesh and 5G MiFi series, repeaters and wireless access points | September 9, 2026 to March 6, 2028 |
| MSI | Radix GRBE94 and GRBE36 routers | October 21, 2026 to April 17, 2028 |
| SERCOMM | XF10 10GEPON ONU / Wi-Fi 7 home gateway | November 6, 2026 to May 8, 2028 |
An approval’s end date governs the opportunity to obtain equipment authorization. The FCC says a device authorized during that window can still be imported, marketed and sold after the conditional approval expires. That matters for ordering and support decisions: the window’s closing is not itself a deadline for removing an already-authorized model from retail sale.
For an ISP or distributor, retaining the relevant model identifier, FCC authorization and approval scope makes the purchasing decision traceable. A class-wide entry can cover more than a single SKU, but the supplier still needs to show how the offered hardware falls within that class. The existence of these approvals also gives buyers a concrete alternative to assuming the entire foreign-produced router market is closed.
Software updates have a separate waiver through 2029
The FCC’s May 8 waiver extension permits qualifying software and firmware updates for routers authorized before the March 23, 2026 Covered List addition until at least January 1, 2029. It extends the earlier relief and includes analogous Class II permissive changes that mitigate harm to consumers. Covered updates include vulnerability patches and changes supporting continued functionality or compatibility.
This maintenance permission is separate from authorization of a new model. The waiver concerns changes to already-authorized devices, and other applicable FCC requirements continue to apply. Manufacturers making Class II changes must still follow that process rather than treating the waiver as unrestricted permission to modify and market hardware.
The FCC also permits repairs of authorized devices already held by consumers and replacement with identical component parts. For an owner deciding whether to keep a router, the practical task is to confirm that the vendor or ISP still provides the necessary support and updates. Regulatory permission for updates gives suppliers a route to maintain equipment; it is not a promise that a particular supplier will support a particular product indefinitely.
An application must trace ownership, supply chains and onshoring
The conditional-approval application guidance asks producers to disclose their corporate structure, supply chain and US manufacturing plans. Submissions go to [email protected] for forwarding to the Department of War and Department of Homeland Security. The guidance permits approvals of up to 18 months and requires an authorized corporate officer to certify the submission’s completeness and accuracy, with material changes disclosed promptly.
The ownership disclosure includes parents, subsidiaries, affiliates and joint ventures, beneficial owners with at least 5% equity, and board and executive information. Supply-chain disclosure includes a bill of materials, component and design origins, and responsibility for intellectual property and software updates. These are substantive disclosures about control of the product, rather than a declaration that the selling company is American.
Applicants must also provide a detailed, time-bound plan to establish or expand US manufacturing for the router. A responsible contact or office must report progress to the approving agency quarterly. Material misrepresentation or knowing violations can lead to termination of an approval and exclusion from reapplication. A manufacturer evaluating this route therefore needs coordinated engineering, supply-chain and corporate information before seeking a determination.
Keep security support separate from market authorization
NIST’s consumer-router security profile treats a router as a product that can include mobile applications and remote services alongside the physical device. It recommends evaluating those associated components too. A legally available router still needs secure administration and a maintained software path across the parts of the product that can manage it.
The profile recommends strong authentication for configuration access by authorized people and services. It also calls for update packages to be signed by their source, with ISP co-signing where applicable. These controls address who can change the router and how its software reaches it, giving buyers specific capabilities to investigate alongside authorization status.
For a small office, keep the responsibilities explicit: identify who administers the router, who supplies updates and which associated applications or services have management access. The access-control approach in our zero-trust architecture guide can help structure those permissions. FCC eligibility resolves whether the model can enter the market; maintaining those permissions and software protections is continuing work after installation.





