February has been the month of home improvements. I finally got Taylor on board and interested in updating our home, YAY!!!!!!!!! My first project was the banister. It was a lot of work but I love the end result!
 |
| Before |
 |
| After |
After I painted the banister we painted all the open space upstairs (the loft, hallway, and wall going up the stairs). Sorry I forgot to take before and after pictures.
The next project has been my favorite. I ripped out all the old tile, replaced the backer-board, painted the mantle, and then re-tiled the fireplace and floor in front of the fire place. I love our new fireplace. It changes our family room!
 |
| The floor tile before I grouted it. |
 |
| The finished product. |
The next project was the power room. This has been the biggest project but it needed to be done. We tore out all the tile, baseboards, wallpaper, counter top, sink, toilet, mirror, and light fixture. We replaced the tile with wood tile, painted the vanity and replace the top, installed a new toilet, painted the walls, replaces the baseboards, and framed the mirror. It looks so much better then before!
 |
| Before....... |
 |
| Before |
 |
| Ripping out the tile |
 |
| re-tiling | | |
|
|
We are planning on starting work in the laundry room next. Then we will work on the kids bathroom, master bath, and kitchen.