Jump to content

Cyclone Harvey

From Wikipedia, the free encyclopedia
Severe Tropical Cyclone Harvey
Tropical Cyclone Harvey on 7 February 2005
Meteorological history
Formed5 February 2005
Dissipated7 February 2005
Category 3 severe tropical cyclone
10-minute sustained (BOM)
Highestย winds120ย km/h (75ย mph)
Lowestย pressure967 hPa (mbar); 28.56ย inHg
Tropical storm
1-minute sustained (SSHWS/JTWC)
Highestย winds95ย km/h (60ย mph)
Lowestย pressure987 hPa (mbar); 29.15ย inHg
Overall effects
FatalitiesNone
Damage$750,000 (2005 USD)
Areasย affectedNorthern Territory, Queensland
IBTrACSEdit this at Wikidata

Part of the 2004โ€“05 Australian region cyclone season

Severe Tropical Cyclone Harvey was a tropical cyclone that struck Queensland and the Northern Territory of Australia during the 2004โ€“05 Australian region cyclone season. It had a minimum pressure of 967 mbar (hPa; 28.56 inHg)[1] and maximum wind gusts of 220 kilometres per hour (140ย mph).[2]

Meteorological history

[edit]
Map plotting the storm's track and intensity, according to the Saffirโ€“Simpson scale
Map key
ย  Tropicalย depression (โ‰ค38ย mph,ย โ‰ค62ย km/h)
ย  Tropicalย storm (39โ€“73ย mph,ย 63โ€“118ย km/h)
ย  Categoryย 1 (74โ€“95ย mph,ย 119โ€“153ย km/h)
ย  Categoryย 2 (96โ€“110ย mph,ย 154โ€“177ย km/h)
ย  Categoryย 3 (111โ€“129ย mph,ย 178โ€“208ย km/h)
ย  Categoryย 4 (130โ€“156ย mph,ย 209โ€“251ย km/h)
ย  Categoryย 5 (โ‰ฅ157ย mph,ย โ‰ฅ252ย km/h)
ย  Unknown
Storm type
triangle Extratropical cyclone, remnant low, tropical disturbance, or monsoon depression

A series of weak low pressure systems in the Gulf of Carpentaria and Timor Sea prompted the Bureau of Meteorology to go on Low Key Standby on 3 February 2005. While there was a moderate risk of tropical cyclone development, there were several weak lows, not a main well-defined low, and this led to High Key Standby being delayed until 4 February. On 5 February, the Brisbane Tropical Cyclone Warning Center (TCWC) issued an advice for municipalities along the southern side of the Gulf of Carpentaria as the Watch Phase was entered. On 6 February, Warning Phase commenced as Harvey strengthened to a Category 1 storm, and by 7 February, the cyclone had reached Category 3. The system then made landfall along the coast of the southern side of the gulf later that day.[3]

Preparations and impact

[edit]

Warnings were issued along the coast between Mornington Island in Queensland and Port McArthur, Borroloola and Robinson River in the Northern Territory. Municipalities were warned to expect flooding and high tides.[4]

At Robinson River, flooding led to "severe road damage," which was estimated to be $1 million AUD ($750,000 USD in 2005). The river rose nearly 16 metres (52ย ft), coming one metre away from the local power station. Downed trees and minor building damage was also reported. At Pungalina Station, strong winds and 60ย mm (2.4ย in) of rain were reported, and many trees were uprooted or broken.[5]

Aftermath

[edit]

The Bureau of Meteorology retired the name Harvey after its usage.[6]

See also

[edit]

References

[edit]
  1. โ†‘ "Tropical Cyclone HARVEY". Australian Government - Bureau of Meteorology. Retrieved 3 September 2011.{{cite web}}: CS1 maint: deprecated archival service (link)
  2. โ†‘ "Interim Report on tropical cyclone Harvey" (PDF). TROPICAL CYCLONE INFORMATION SERVICE. Queensland Government - Environmental Protection Agency. Archived from the original (PDF) on 14 March 2011. Retrieved 3 September 2011.
  3. โ†‘ "Tropical Cyclone Harvey". Previous Cyclones. Australian Government - Bureau of Meteorology. Retrieved 3 September 2011.
  4. โ†‘ "Harvey hits northern coast". The Age. 7 February 2005. Retrieved 3 September 2011.
  5. โ†‘ "SIGNIFICANT WEATHER - February 2005". Australian Government - Bureau of Meteorology. Retrieved 3 September 2011.
  6. โ†‘ "Tropical Cyclone Names". Australian Government - Bureau of Meteorology. Retrieved 11 August 2011.
[edit]