Line B1 (Tianjin Metro)
| Line B1 | |
|---|---|
| Overview | |
| Other name | Bintie Line 1 (Binhai Metro Line 1)[1] |
| Status | Under construction |
| Owner | Tianjin Rail Transit |
| Locale | Binhai New Area, Tianjin, China |
| Termini | |
| Stations | 22 (Phase 1) [2] |
| Service | |
| Type | Rapid transit |
| System | Tianjin Rail Transit |
| Operator(s) | Tianjin Binhai New Area Rail Transit Investment Development Co., Ltd |
| Depot | Huanggang depot[3] |
Rolling stock | CRRC Tangshan 6 cars type A rolling stock[4][5][3] |
| Technical | |
| Line length | 22.5 km (14.0 mi) (Phase 1 North section)[6] 31.5 km (19.6 mi) (Phase 1 total) [2][4] |
| Num of tracks | 2 |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrification | 1.5 kV DC Overhead catenary contact |
Operating speed | 80 km/h (50 mph) (Maximum design speed)[3] |
Line B1 of Tianjin Metro is an under construction metro line serving Tianjin, China. The Phase 1 Northern section of Line B1 is spanning 22.5 km long, with a total investment of 21.89 billion RMB.[6] Line B1 is known as the "north-south central axis" of Binhai New Area, spanning 31.5 km with all 22 stations underground and a total investment of 27.6 billion RMB. Line B1 is scheduled to commence operation by the end of 2026.[5]
As of March 2025, the main structures of 16 stations have been completed, 13 out of 19 stations is connected.[7]
History
[edit]Construction of Line B1 was kicked off on 23 February 2016.[5][8][9]
On 25 October 2024, Tianjin Metro began receiving their first rolling stock set of Line B1.[3]
On 31 October 2024, the right shield underground section from Yushandao Station to Xinbeilu Station was completed.[10]
On 9 March 2025, the section from Yushandao station to Chezhanbeilu station was completed.[11]
On 12 January 2026, the underground section from Xinjiayuanxi Station to Guoxiangxidao Station was successfully connected.[2]
On 3 June 2026, the underground section from Xinjiayuandong Station to Tanggu Station was completed.[2][12]
Stations
[edit]All 22 stations are underground.[2]
| Station name | Transfer | Distance
km |
Location | ||
|---|---|---|---|---|---|
| Pinyin | Chinese | ||||
| Xinjiayuandong | 欣嘉园东 | Binhai New Area | |||
| Xinjiayuan | 欣嘉园 | ||||
| Xinjiayuanbei | 欣嘉园北 | ||||
| Xinjiayuanxi | 欣嘉园西 | ||||
| Guoxiangxidao | 国祥西道 | ||||
| Binhaixizhan | 滨海西站 | B3 Z2 | |||
| Dijiudajie | 第九大街 | ||||
| Yunshandao | 云山道 | ||||
| Xinbeilu | 新北路 | ||||
| Chezhanbeilu | 车站北路 | B2 | |||
| Guangzhoudao | 广州道 | B4 | |||
| Tanggu | 塘沽 | ||||
| Waitangongyuan | 外滩公园 | ||||
| Wenhuajie | 文化街 | B5 | |||
| Binhaizhan | 滨海站 | Z1 Z4 | |||
| Youyidao | 友谊道 | B3 | |||
| Jinlindao | 金临道 | ||||
| Tianjindadao | 天津大道 | B2 | |||
| Xinchengyi | 新城一 | ||||
| Xinchenger | 新城二 | ||||
| Xinchengsan | 新城三 | Z4 | |||
| Xinchengsi | 新城四 | ||||
Rolling stocks
[edit]Line B1 uses 30 sets of rolling stocks which are type 6A and were produced by CRRC Tangshan, with an estimated value of 1.1 billion RMB. This will mark the first line of Tianjin Metro system to use A-type high capacity rolling stock instead of ordinary B-type.[6][2][4]
References
[edit]- ↑ "新时代新征程新伟业 总投资超5700亿元!解码"十大工程",让你更加读懂美丽"滨城"". 21 November 2022.
- 1 2 3 4 5 6 "B1线最新进展!16座车站主体结构封顶". 24 July 2026.
- 1 2 3 4 "轨道交通B1线,来车了!这些在建线路,最新进展公布——". 25 October 2024.
- 1 2 3 "30列!价值11亿!轨道交通B1线最新进展来了~". 19 March 2025.
- 1 2 3 "天津地铁B1线关键站验收通过!开通后,滨海新区交通、民生大升级". 21 November 2025.
- 1 2 3 "B1号线杀回来了!滨海新区一条地铁,正在改写2026天津楼市格局". 4 May 2026.
- ↑ "轨道交通B1线建设有了新进展". 10 March 2025.
- ↑ "天津滨海地铁B1、Z4、Z2线最新消息(线路图+站点+开工时间)". 15 March 2021.
- ↑ "天津地铁B1线一期进度跟踪(2025-05)". 27 May 2026.
- ↑ "天津在建地铁最新进展!这条年底前满足通车运营条件!". 4 November 2024.
- ↑ "轨道交通B1线,最新进展来了!". 10 March 2025.
- ↑ "预计今年内全部完工!天津这条地铁最新建设进展公布!". 4 June 2026.