Jump to content

Red Line (Ahmedabad Metro)

From Wikipedia, the free encyclopedia
Red Line
Overview
StatusOperational
LocaleAhmedabad
Gandhinagar
Termini
Stations15 (14 Operational)
Service
TypeRapid Transit
SystemAhmedabad Metro
OperatorGujarat Metro Rail Corporation Limited
Rolling stock
Hyundai Rotem
History
Opened6 October 2022; 4 years ago (2022-10-06)
Technical
Line length18.87 km (11.73 mi)
CharacterElevated
Track gauge1,435 mm (4 ft 8+1⁄2 in) (Standard gauge)
Electrification750V DC Third Rail
Route map

Motera Stadium Subway interchange Yellow Line
Sabarmati Ahmedabad Bus Rapid Transit System
AEC Ahmedabad Bus Rapid Transit System Sabarmati  Juction railway station
Sabarmati Railway Station
Ranip Ahmedabad Bus Rapid Transit System GSRTC
Vadaj Ahmedabad Bus Rapid Transit System
Vijay Nagar
Usmanpura
Old High Court Subway interchange Blue Line
Gandhigram Gandhigram railway station
Paldi
Shreyas
Rajiv Nagar
Jivraj Park
APMC GSRTC
Gyaspur Depot

The Red Line of the Ahmedabad Metro is a metro route of the mass rapid transit system in Ahmedabad, India.

History

[edit]
North-South Corridor under construction near Sabarmati Powerhouse and Sabarmati Railway Station 9 July 2017

The Phase-1 (North-South Corridor) of Ahmedabad Metro consists of 15 metro stations from APMC to Motera Stadium with a total distance of 18.87 km (11.73 mi). The line is completely elevated. It connects Motera Stadium to APMC, Vasna and will be passing through Sabarmati, AEC, Sabarmati Railway station, Ranip, Vadaj, Vijaynagar, Usmanpura, Old High court, Gandhigram, Paldi, Shreyas, Rajivnagar and Jivraj stations.[1] The Phase-1 of the North-South Corridor was inaugurated on 30 September 2022 by Indian Prime Minister Narendra Modi.[2] It was opened to public on 6 October 2022 except Sabarmati Railway Station metro station which is under construction.[3][4]

List of stations

[edit]

Following is a list of stations on this route:[5][6]

Red Line
# Station Name Opening Connections[7] Layout
EnglishGujarati
1Motera Stadiumમોટેરા સ્ટેડિયમ30 September 2022Yellow LineElevated
2Sabarmatiસાબરમતી30 September 2022 Ahmedabad BRTSElevated
3AECએ ઇ સી30 September 2022 Ahmedabad BRTS

Sabarmati HSR (under-construction)

Elevated
4Sabarmati Railway Stationસાબરમતી રેલવે સ્ટેશનUnder construction Sabarmati JunctionElevated
5Ranipરાણીપ30 September 2022 Ahmedabad BRTS
GSRTC Bus Station
Elevated
6Vadajવાડજ30 September 2022 Ahmedabad BRTSElevated
7Vijay Nagarવિજય નગર30 September 2022NoneElevated
8Usmanpuraઉસ્માનપુરા30 September 2022NoneElevated
9Old High Courtજૂની હાઇ કોર્ટ30 September 2022Blue LineElevated
10Gandhigramગાંધીગ્રામ30 September 2022 GandhigramElevated
11Paldiપાલડી30 September 2022NoneElevated
12Shreyasશ્રેયસ30 September 2022NoneElevated
13Rajiv Nagarરાજીવ નગર30 September 2022NoneElevated
14Jivraj Parkજીવરાજ પાર્ક30 September 2022NoneElevated
15APMCએ પી એમ સી30 September 2022GSRTC Bus StationElevated

Map

[edit]
Map
Click on icons for more details


References

[edit]
  1. ↑ "Project Profile". GMRC. Retrieved 8 March 2019.
  2. ↑ "PM Modi to launch Ahmedabad Metro Phase 1, flag off Vande Bharat Express during two-day Gujarat visit". 28 September 2022.
  3. ↑ "મેટ્રો ટ્રેનની સવારી: અમદાવાદમાં થલતેજ-વસ્ત્રાલ મેટ્રો ગાંધી જયંતીથી, એપીએમસી-મોટેરા 6 ઓક્ટોબરથી શરૂ થશે". Divya Bhaskar (in Gujarati). 30 September 2022. Retrieved 30 September 2022.
  4. ↑ "Ahmedabad: Metro service on North-South corridor to begin on October 6". The Indian Express. 3 October 2022. Retrieved 4 October 2022.
  5. ↑ "Chugging in, clearing hurdles: Prime Minister to inaugurate Phase I of Ahmedabad Metro in August this year". The Indian Express. 11 July 2022. Retrieved 13 July 2022.
  6. ↑ "Route Information and Time Table". AHMEDABAD METRO RAIL PROJECT. Archived from the original on 20 May 2024. Retrieved 7 December 2024.
  7. ↑ "Multi Model Integration". Gujarat Metro Rail Corporation (GMRC) Limited. Retrieved 14 April 2026.