Summary

When using --builder concurrent, specifying multiple lifecycle phases from the same lifecycle (e.g., mvn package install or mvn package javadoc:aggregate-jar install) causes later non-overlapping phases to be silently dropped. The install phase never executes.

Steps to reproduce

Create a multi-module project:

parent (pom)
├── module-a (jar)
└── module-b (jar, depends on module-a)

Run with the concurrent builder:

# Works correctly - install runs for all modules
mvn -B --builder concurrent install

# BUG: install phase is silently dropped
mvn -B --builder concurrent package install

# BUG: install phase is silently dropped
mvn -B --builder concurrent package javadoc:aggregate-jar install

Expected behavior

mvn --builder concurrent package install should run all phases from validate through install (deduplicated), including the install phase itself.

Actual behavior

Only phases up to package execute. The install phase (and any phases between package and install like verify) are silently dropped.

Analysis

The issue is in BuildPlan.merge(Map<String, BuildStep>, Map<String, BuildStep>) at line 98-109 of BuildPlan.java.

When merging two plans with overlapping phases:

  1. The merge finds "first" steps in the new plan (steps with no predecessors) and chains them after the "last" steps in the existing plan
  2. But only first steps that are not already present in the existing plan get these ordering edges (line 105: filter(addNode -> !org.containsKey(addNode.name)))
  3. For package install: the new plan's first step (e.g., validate) already exists in the existing plan, so it gets filtered out
  4. The truly new steps (verify, install) are NOT first steps — they have predecessors within their own plan
  5. Result: the new steps get added to the map but have no ordering edges connecting them to the existing plan's terminal steps

The overlapping phases get correctly merged via putIfAbsent, but the non-overlapping later phases become unreachable in the execution graph.

Comparison with sequential/multithreaded builders

The sequential and multithreaded builders (-T N) process each task segment independently and re-run all phases from scratch. They never lose phases but duplicate execution (e.g., mvn package install runs validate→package twice).

Command Sequential / -T --builder concurrent
install validate→install × 1 validate→install × 1 ✅
package install validate→package × 2, then install validate→package × 1, install lost ❌
package javadoc:aggregate-jar install validate→package × 3, then install validate→package × 1, javadoc, install lost ❌

Claude Code on behalf of Guillaume Nodet

Activity

  1. added a commit that references this issue on Oct 15, 2026
    84ce22b
  2. added a commit that references this issue on Oct 15, 2026
    1e32f12
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions