Things are starting to come together for the arrival of baby boy #3. The 2 major projects are done (for the most part). The bunk bed is done and put together and Harrison is 2 weeks into potty training and it's going fairly well. My parents spent a lot of time on the bunk bed. We decided on a design that Dean said would be easy for him to make. (FYI, the top bedding is lime green, not yellow. The bottom quilt has lime green squares in it.)
Here is a picture of it with the latch open and the railing pulled down. Compare to first picture to see the railing up.
Also, the ladder easily comes off. So far Harrison has been good about only climbing the ladder when mommy or daddy is in the room (that's the rule). I'll definitely be taking the ladder off when other kids come over to play though. The kids discovered the first night that we can hang blankets from the top railing, making a cool fort for the bottom bunk. Anyways, we are very happy to have the bunk beds. I love the look of it in the room. It's a big boy room now. Thanks Mom and Dean!
All the baby gear is out. I can't believe how much room a little person takes up. He has so much "gear". Oh, here is a picture of the boys "St. Patricks" day shirts. Douglas said he needed a green shirt so he doesn't get pinched. And he loves dinosaurs so that's what we went with. They were plain white shirts that I dyied and painted the stripes and dino on. I LOVE them!








Have you ever seen Bakerella's cupcake pops? Here